Saturday, November 10, 2007

The jig is up!

(edited to add a couple more pictures of the stair jigs)

This is how we currently "get down in the hole." It's a ladder, if you couldn't
tell. In the window well. Until last Saturday, the stair opening was covered by sheets of plywood so no one would fall down. Frugaldad framed the walls that go on either side of the stairs and took up the plywood. (For all of you worried about safety, there's still a piece of wood blocking the entrance to the stairs, and strips of wood across the stud walls to keep people from slipping between the studs) This week the main project was the stairs.


Frugaldad took a day off work this week to work on the house, and he cut the stair stringers. Here's the first one of three. He built two jigs to help him cut all the stairs the same.

One of the jigs

The jig in place to cut the next step


Saw on the jig

The other jig

Jig in place




Saw on the other jig




Three stair stringers ready to be lowered through the stairwell window.

Then today, he worked on building the landing of the stairs. There will be a long run of stairs, then a square landing, then two more steps. An aerial view of the framed landing.

The landing from downstairs.


We've been lucky to have my friend Jessica's husband Cliff helping with the roof. He has roofing experience and he's pretty fast! Frugaldad is able to do these other things while Cliff works on the roof. Unfortunately with the time change, there isn't much daylight left at the end of a workday, so work can only be done for a little while each weekday, but I'll post pictures when the roof is all done.

1 comment:

QueenMeadow said...

Yay for stairs! And I'm sure having the roof close to being done is a big relief at this time of year ;).