Before we could set the rest of the floor joists, we decided that the "shelf" next to the house that caused all the trouble with the compaction should be filled in with concrete to make a good storage place in the basement. Frugaldad decided this was a good time to practice laying concrete so he brought home a new toy.
He set forms to do about half at a time. The first day he did 4 blocks and the second day he did 3 blocks.
It was raining but it needed to be done anyway so we could finish the floor. So we made a tent.
The kids' handprints and a print of a huge maple leaf.
Then we could set the rest of the joists in place, and deck the rest of the floor. We put some extra OSB over the stair opening so nobody would fall through by accident. The stairs won't get built until the roof is on to keep them from getting wet.
Before Frugaldad left for Singapore on a business trip he started framing the exterior walls.
Now the exterior walls are all framed with window openings and the trusses are ordered and will be delivered next week. We decided to have the truss company install them and deck the roof because the weather has been so rainy! They can get it done in less than a day.