Thursday, January 28, 2010
business
I have enabled comment moderation on posts older than 14 days. I have been getting spam comments on old posts. Thanks!
Friday, January 8, 2010
kitchen cabinets
Friday, January 1, 2010
it's beginning to look like a kitchen
There are 45 screws holding this corner cabinet carcass together. Go to my flickr set to see all the progress pictures. (I arrange them in date order, so the end is the most current).
I should be canning in the new kitchen this summer! I am really getting excited!!!
Tuesday, December 22, 2009
building cabinets
Frugaldad "gets" to take 2 weeks of vacation over the holidays. What better thing to do than build a new kitchen? He's been building cabinets.
Photos that come before today's progress are at the end of the Addition set at flickr.
here's a little preview (look at the fog!)
Photos that come before today's progress are at the end of the Addition set at flickr.
here's a little preview (look at the fog!)
Sunday, May 31, 2009
CARPET!!!!!!!!!!!!
I never showed you a picture of the trim board on the edge of the bamboo floor.

Then the carpet guys came!

Then we started moving toys into what will be a really big playroom until we finish the basement and turn it into a really big playroom, and the upstairs becomes a master suite.


What amazes me is that I know that we have so many fewer toys that a lot of families. Yet there are still so many!
Then the carpet guys came!
Then we started moving toys into what will be a really big playroom until we finish the basement and turn it into a really big playroom, and the upstairs becomes a master suite.
What amazes me is that I know that we have so many fewer toys that a lot of families. Yet there are still so many!
Thursday, May 28, 2009
counting the minutes....
until the CARPET gets installed in the morning! Only upstairs, but you'd better believe we're moving stuff in there as soon as we can!

(I realized it isn't actually finished in the picture, the trim piece at the edge wasn't installed so you will get another picture later)

we are far from finished, but this is a big step! We'll put trim in the windows soon so we can hang blinds. That evening sun from the west is blinding! And we'll install baseboards before moving large furniture.
Two years is a long time to cram everything into one living area!
(I realized it isn't actually finished in the picture, the trim piece at the edge wasn't installed so you will get another picture later)
we are far from finished, but this is a big step! We'll put trim in the windows soon so we can hang blinds. That evening sun from the west is blinding! And we'll install baseboards before moving large furniture.
Two years is a long time to cram everything into one living area!
Thursday, May 14, 2009
3.78125
You might call it dumb luck, but we like to refer to it as careful planning.
The stairs are on the south edge of the room, and the factory-manufactured stair nosing had a groove in it. So the floor had to be installed starting at the north edge of the room, because you nail into the tongues of the flooring. But how, pray tell, do you make sure that the flooring meets up with the stair nosing in the right place? If it was off, we would have to rip down an entire course of floor the length of the entire room.
So we measured. And measured. And did some math. And measured and did math again. We laid out a few boards and figured that each joint added 1/32" to the boards themselves, which are 3.75". So we multiplied 3.78125 by the number of courses of floor (it wasn't actually that simple), and then snapped a chalk line where the first course should be nailed. And then we hoped for the best.
This is the line that we have to meet up with, see it a few inches from the edge of the stairs?

It is where the factory stair nosing ends.

So we got 3 courses away from the stairs, and stuck in some scraps, and it is going to be perfect. ...to the 32nd of an inch....perfect.

and that, my friends, is what happens when an engineer builds his own house.
The stairs are on the south edge of the room, and the factory-manufactured stair nosing had a groove in it. So the floor had to be installed starting at the north edge of the room, because you nail into the tongues of the flooring. But how, pray tell, do you make sure that the flooring meets up with the stair nosing in the right place? If it was off, we would have to rip down an entire course of floor the length of the entire room.
So we measured. And measured. And did some math. And measured and did math again. We laid out a few boards and figured that each joint added 1/32" to the boards themselves, which are 3.75". So we multiplied 3.78125 by the number of courses of floor (it wasn't actually that simple), and then snapped a chalk line where the first course should be nailed. And then we hoped for the best.
This is the line that we have to meet up with, see it a few inches from the edge of the stairs?
It is where the factory stair nosing ends.
So we got 3 courses away from the stairs, and stuck in some scraps, and it is going to be perfect. ...to the 32nd of an inch....perfect.
and that, my friends, is what happens when an engineer builds his own house.
Subscribe to:
Posts (Atom)