Tuesday, June 3, 2008
Siding
After we did the blue foam insulation on the outside of the building, we hired someone we know to come put the siding up. I just realized I don't have any finished pictures, so this one will have to do! It is currently raining or else I'd go snap some.
Friday, May 2, 2008
In the trenches
While we were in the midst of all this addition craziness, we decided it would be fun to add another element. Since we ran new plumbing and connected it to the existing sewer, it was the perfect time to run an extra water line out to the pasture for a future barn. We'll also put an electrical line in the trench so there is power out there, too. We rented a trenching machine and dug a bunch of trench.
Teach them young...

The trenches
Teach them young...
The trenches
Thursday, April 24, 2008
Electricity and siding
Frugaldad decided that he is going to do all the electrical work himself so on Saturday we did some attic cleaning so he'd have access to run wires. Yesterday he drilled a hole through the top plate of the garage wall to run the wire for the new a/c unit. It's the old wire, just moved from its old location. Then he'll run new wire for an electrical panel in the addition.
We hired a guy we know to come and put the siding up, and it is being delivered tomorrow. He is also doing the soffits, so we'll be officially closed in sometime in the near future!
It all sounds so easy, but after the wire is run, it's insulation and drywall, and then it's basically finished space! There might be a place for the new baby to sleep after all!
We hired a guy we know to come and put the siding up, and it is being delivered tomorrow. He is also doing the soffits, so we'll be officially closed in sometime in the near future!
It all sounds so easy, but after the wire is run, it's insulation and drywall, and then it's basically finished space! There might be a place for the new baby to sleep after all!
Tuesday, April 8, 2008
Exterior foam insulation
HVAC
Last week the HVAC guys came and did all the rough ductwork in the addition. They haven't tied into our existing system yet. We are replacing our 30+ year old furnace as well as putting in an air conditioner to replace the one we got rid of last summer, and we don't want dust in the new equipment, so we'll wait until the drywall is finished before we install the new stuff.
The main trunk in the basement that feeds all the vents

Ducts in the joist bays

Air vent in the basement ceiling for one of the future bedrooms

Air vent on first floor

Air return in south half

Air return over the stairs (serves the north half and basement)
The main trunk in the basement that feeds all the vents
Ducts in the joist bays
Air vent in the basement ceiling for one of the future bedrooms
Air vent on first floor
Air return in south half
Air return over the stairs (serves the north half and basement)
Tuesday, March 4, 2008
Our #1 and #2 Priority
We passed our plumbing inspection on Valentine's Day. The inspector was very impressed with Frugaldad's DIY job. Then the following Saturday, Frugaldad cut into the existing septic line and tied the new plumbing into it.
In case you missed the news, I fell and broke my ankle on February 13 so I haven't been outside to take pictures or even see the progress for almost 3 weeks. But Frugaldad assures me that the progess is great. He framed all the perimeter walls in the basement so they can be insulated and now that most of the snow is melted, he and the kids cleaned up most of the rest of the debris around the site.
Subscribe to: